The client said yes three weeks ago. Why have they not ordered yet?

Between the signature and the first order sits a process nobody times. It is the most expensive stretch in the company, and the only one that appears in no report.

by ·

The deal went well. Sales closed it, the client is happy, the CRM row is green. And then nothing happens for twenty days — because the company search is missing, because the ID arrived unreadable, because the credit-limit request is sitting on the desk of someone who is on holiday this week.

Nobody measures that stretch. Sales moved on to the next deal, admin believes it is fast, and the client — who still has their previous supplier in the meantime — slowly stops being in a hurry. This article times those twenty days one by one, shows which of them are pure waiting, and what putting them back is worth.

1 · The twenty days nobody looks at

Here is the same client on two tracks: how they come aboard today in a company that works well but by hand, and how they come aboard when the process has a system behind it. Same scale. Tap a day to see what happens in it — and what it costs.

How they come aboard today — 21 calendar days

With the process governed — 2 days

The number that makes it arguable

Of eleven marked days, five are pure waiting: nobody works on them and the file ages on its own. Nobody is being lazy — the process has nowhere to live, so it lives in people's inboxes, and an inbox has no queue, no state and no deadline.

2 · Why it is not a people problem

The instinctive fix is putting somebody in charge of chasing files. It works for a few months and then breaks, because the problem is not missing attention: it is a missing place.

3 · What actually changes, in order of return

You do not need to build it all at once. These four pieces, in this order, cover most of the gap between the two tracks — and the first two stand up in a few weeks.

4 · What putting those days back is worth

This is not a cost saving: it is margin the company has already sold and not yet collected. It is worth working out on your own numbers, because it is the figure that makes arguable an investment that otherwise looks like an organisational whim.

And there is a line the sum does not include because it cannot be measured: the clients who go cold during those three weeks. They do not leave with a no — the previous supplier simply still serves them, the urgency passes, and the first order comes in smaller than it would have been. It is a real loss that appears in no report, and I suspect it is larger than the deferred margin.

Let us time your onboarding

In the half-hour audit we do exactly what you have just read: we take the last client who came aboard and reconstruct their days, one by one, up to the first order. All it needs is somebody who remembers the dates — and they usually do, because they were frustrating.

At the end you have two numbers of your own: how many days it really takes and how many of those are pure waiting. From there the rest is a decision with data under it, not an impression. And if the numbers say your process is already fast, I will tell you and we part with one more fact each.

The service behind this article

Custom web application development

If this was useful, carry on from here

FAQ

Why do weeks pass between a client signing and their first order?

Because that part of the process has nowhere to live: it lives in people's inboxes, and an inbox has no queue, no status and no deadline. The company search, the document that arrived unreadable, the credit request sitting on somebody's desk. In the case reconstructed in the article it is twenty-one calendar days, and part of that is pure waiting: nobody is working on it, the file simply ages.

What should you automate first in client onboarding?

The form that validates as it is filled in. The VAT number checked the moment it is typed, the unreadable document rejected immediately rather than three days later: it removes the second request to the client, which is the one that costs credibility. Right after comes visibility — a page telling the client where their file stands and what is missing, turning twenty days of silence into an explained wait.

How do you measure the time from signature to first order?

In calendar days, not working days: the customer counts weekends too. Take the last client you onboarded and reconstruct the dates one by one up to the first order, separating days when someone worked from pure waiting. You need two numbers: how many days it really takes, and how many of those are nobody's work. The second is the one you can act on.

Why put a deadline on the states of a case?

A state exists to trigger something. If «documents requested» lasts more than three days, someone has to know: without states there are no thresholds, and without thresholds the delay surfaces when the client points it out — the worst possible moment, once the enthusiasm of signing has worn off.

Nadia Maar